Partner with Lermond Engineering Limited for professional foundation, geotechnical, civil, and construction solutions backed by over three decades of industry experience, proven expertise, and an unwavering commitment to quality and safety.
Lermond Engineering Limited was engaged to undertake the bored pile works for the East Fire Station under the Hong Kong International Airport Three-Runway System Project (Contract No. 3804). The project formed part of the strategic expansion of Hong Kong International Airport, supporting the operational requirements and emergency response facilities associated with the Three-Runway System development.
The works comprised the construction of large diameter bored pile foundations ranging from 1800mm to 2000mm in diameter to support the proposed East Fire Station development. As part of a major airport infrastructure project, the works were carried out under stringent quality, safety, and programme requirements, requiring close coordination with the project team and careful construction planning.
Through its expertise in foundation engineering and large diameter bored pile construction, Lermond successfully delivered the foundation works, contributing to the continued expansion and enhancement of airport infrastructure at Hong Kong International Airport.
Project Name:
Bored Pile Works for HKIA Three Runway System Project – Contract No. 3804 – East Fire Station
Client:
Hong Kong International Airport
Main Contractor:
BUCG-BUCI-KSL Joint Venture
Project Duration:
January 2023 – June 2023
Scope of Works:
Large Diameter Bored Pile Works